Vacuum forming or Rotational moulding – A Comparison for Thermoforming – Short Runs

vacuum forming and rotational moulding are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. T

0 Views PPOEM 17 Sep,2026

Trim draw ratio – Method and Checks – Food Contact Parts

This guide covers how to trim draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cu

0 Views PPOEM 17 Sep,2026

Single cavity tooling Compared with multi cavity tooling – Painted Parts

single cavity tooling and multi cavity tooling are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished

0 Views PPOEM 17 Sep,2026

How to trim rib layout on Thick Gauge Parts – Short Runs

This guide covers how to trim rib layout on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cu

0 Views PPOEM 17 Sep,2026

Control packing method: A Practical Thermoforming Guide – Medical Housings

This guide covers how to control packing method on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before toolin

0 Views PPOEM 17 Sep,2026

How to Quote draw ratio in Vacuum Forming

This guide covers how to quote draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is c

0 Views PPOEM 17 Sep,2026

How to choose lead time on Thick Gauge Parts – Large Housings

This guide covers how to choose lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is c

0 Views PPOEM 17 Sep,2026

Calculate wall thickness the Right Way – 6 mm Sheet

This guide covers how to calculate wall thickness on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tool

0 Views PPOEM 17 Sep,2026

How to avoid gloss level Before Tooling Starts – Short Runs

This guide covers how to avoid gloss level on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Mould venting – Why It Matters – High Volume Runs

In vacuum forming and thermoforming, mould venting is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explains what

0 Views PPOEM 17 Sep,2026

Troubleshoot rib layout – Method and Checks – Medical Housings

This guide covers how to troubleshoot rib layout on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooli

0 Views PPOEM 17 Sep,2026

Batch to batch consistency in Thermoforming: Practical Notes – 6 mm Sheet

In vacuum forming and thermoforming, batch to batch consistency is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry e

0 Views PPOEM 17 Sep,2026