Preventing scorched sheet surface Before Tooling Is Cut – 6 mm Sheet

scorched sheet surface is one of the faults that shows up during sampling on any new thick gauge tool. It is visible on the part, but the cause is usually in the mould, the heating cycle or

0 Views PPOEM 17 Sep,2026

Design insert placement the Right Way – Medical Housings

This guide covers how to design insert placement on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooli

0 Views PPOEM 17 Sep,2026

Uv stability of sheet – Why It Matters – Large Housings

In vacuum forming and thermoforming, UV stability of sheet is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explai

0 Views PPOEM 17 Sep,2026

How to reduce trim tolerance Before Tooling Starts – Thick Gauge Work

This guide covers how to reduce trim tolerance on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

Pressure forming vs Vacuum forming: Which Route Fits Your Part – Medical Housings

pressure forming and vacuum forming are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The

0 Views PPOEM 17 Sep,2026

Maintain sheet material – Method and Checks – Medical Housings

This guide covers how to maintain sheet material on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooli

0 Views PPOEM 17 Sep,2026

Maintain packing method: A Practical Thermoforming Guide – 6 mm Sheet

This guide covers how to maintain packing method on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooli

0 Views PPOEM 17 Sep,2026

How to specify lead time on Thick Gauge Parts

This guide covers how to specify lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

How to Validate draft angle in Vacuum Forming

This guide covers how to validate draft angle on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

Bubbles in the sheet: What It Tells You About the Tool

bubbles in the sheet is one of the faults that shows up during sampling on any new thick gauge tool. It is visible on the part, but the cause is usually in the mould, the heating cycle or th

0 Views PPOEM 17 Sep,2026

Sheet extrusion direction – Why It Matters – Food Contact Parts

In vacuum forming and thermoforming, sheet extrusion direction is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry ex

0 Views PPOEM 17 Sep,2026

How to quote packing method Before Tooling Starts – Medical Housings

This guide covers how to quote packing method on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026