Solvent bonding – Why It Matters – High Volume Runs

In vacuum forming and thermoforming, solvent bonding is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explains wha

0 Views PPOEM 17 Sep,2026

How to Plan lead time in Vacuum Forming – 6 mm Sheet

This guide covers how to plan lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cut

0 Views PPOEM 17 Sep,2026

How to control cool down time Before Tooling Starts – Outdoor Parts

This guide covers how to control cool down time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before toolin

0 Views PPOEM 17 Sep,2026

Choose shrinkage allowance the Right Way – Food Contact Parts

This guide covers how to choose shrinkage allowance on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before to

0 Views PPOEM 17 Sep,2026

Fixturing for welding Explained for Thick Gauge Buyers – Large Housings

In vacuum forming and thermoforming, fixturing for welding is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explai

0 Views PPOEM 17 Sep,2026

Control lead time – Method and Checks – 6 mm Sheet

This guide covers how to control lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Choosing Between TPO and ABS – Short Runs

TPO and ABS are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The comparison below is the

0 Views PPOEM 17 Sep,2026

How to Design draft angle in Vacuum Forming – Painted Parts

This guide covers how to design draft angle on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

How to troubleshoot sheet heating Before Tooling Starts – Medical Housings

This guide covers how to troubleshoot sheet heating on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before to

0 Views PPOEM 17 Sep,2026

Design corner strength the Right Way – Medical Housings

This guide covers how to design corner strength on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before toolin

0 Views PPOEM 17 Sep,2026

Calculate rib layout: A Practical Thermoforming Guide – Large Housings

This guide covers how to calculate rib layout on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

How to avoid rib layout on Thick Gauge Parts – Painted Parts

This guide covers how to avoid rib layout on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is c

0 Views PPOEM 17 Sep,2026