5 axis routing Compared with die cutting – Short Runs

5 axis routing and die cutting are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The compa

0 Views PPOEM 17 Sep,2026

Reduce lead time – Method and Checks – Thick Gauge Work

This guide covers how to reduce lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is c

0 Views PPOEM 17 Sep,2026

How to troubleshoot draw ratio on Thick Gauge Parts

This guide covers how to troubleshoot draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooli

0 Views PPOEM 17 Sep,2026

Validate draw ratio – Method and Checks – Large Housings

This guide covers how to validate draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

How to maintain mould venting on Thick Gauge Parts – Thick Gauge Work

This guide covers how to maintain mould venting on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before toolin

0 Views PPOEM 17 Sep,2026

How to Choose cool down time in Vacuum Forming – Large Housings

This guide covers how to choose cool down time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

What sheet storage Means on a Formed Part – 6 mm Sheet

In vacuum forming and thermoforming, sheet storage is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explains what

0 Views PPOEM 17 Sep,2026

Specify cool down time – Method and Checks – Outdoor Parts

This guide covers how to specify cool down time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before toolin

0 Views PPOEM 17 Sep,2026

Design draw ratio the Right Way – Short Runs

This guide covers how to design draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Petg vs Polycarbonate: Cost, Quality and Lead Time – Large Housings

PETG and polycarbonate are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The comparison be

0 Views PPOEM 17 Sep,2026

Improve insert placement – Method and Checks – Thick Gauge Work

This guide covers how to improve insert placement on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tool

0 Views PPOEM 17 Sep,2026

How to calculate tooling cost Before Tooling Starts – Medical Housings

This guide covers how to calculate tooling cost on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before toolin

0 Views PPOEM 17 Sep,2026