How to reduce draw ratio Before Tooling Starts – High Volume Runs

This guide covers how to reduce draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Measure tooling cost – Method and Checks – High Volume Runs

This guide covers how to measure tooling cost on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

Snap fit design Explained for Thick Gauge Buyers – Thick Gauge Work

In vacuum forming and thermoforming, snap fit design is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explains wha

0 Views PPOEM 17 Sep,2026

How to Plan fixture design in Vacuum Forming – Medical Housings

This guide covers how to plan fixture design on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

Troubleshoot batch repeatability the Right Way – Painted Parts

This guide covers how to troubleshoot batch repeatability on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems bef

0 Views PPOEM 17 Sep,2026

Measure scrap rate – Method and Checks – Thick Gauge Work

This guide covers how to measure scrap rate on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

How to maintain cycle time on Thick Gauge Parts

This guide covers how to maintain cycle time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

How to Trim draft angle in Vacuum Forming – Food Contact Parts

This guide covers how to trim draft angle on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is c

0 Views PPOEM 17 Sep,2026

Preventing webbing in recesses Before Tooling Is Cut

webbing in recesses is one of the faults that shows up during sampling on any new thick gauge tool. It is visible on the part, but the cause is usually in the mould, the heating cycle or the

0 Views PPOEM 17 Sep,2026

Vacuum forming Compared with injection moulding – Thick Gauge Work

vacuum forming and injection moulding are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. Th

0 Views PPOEM 17 Sep,2026

Validate rib layout: A Practical Thermoforming Guide – Food Contact Parts

This guide covers how to validate rib layout on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

How to quote corner strength on Thick Gauge Parts – Medical Housings

This guide covers how to quote corner strength on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026