How to quote sheet grade Before Tooling Starts – 6 mm Sheet

This guide covers how to quote sheet grade on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

1 Views PPOEM 17 Sep,2026

How to specify gloss level Before Tooling Starts – Medical Housings

This guide covers how to specify gloss level on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

Plan corner strength the Right Way – Outdoor Parts

This guide covers how to plan corner strength on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

Reduce batch repeatability – Method and Checks – Thick Gauge Work

This guide covers how to reduce batch repeatability on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before to

0 Views PPOEM 17 Sep,2026

Avoid batch repeatability the Right Way – Outdoor Parts

This guide covers how to avoid batch repeatability on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before too

0 Views PPOEM 17 Sep,2026

How to Maintain cycle time in Vacuum Forming – Medical Housings

This guide covers how to maintain cycle time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

Preventing bubbles in the sheet Before Tooling Is Cut – Food Contact Parts

bubbles in the sheet is one of the faults that shows up during sampling on any new thick gauge tool. It is visible on the part, but the cause is usually in the mould, the heating cycle or th

0 Views PPOEM 17 Sep,2026

Flame retardant grades Explained for Thick Gauge Buyers – Outdoor Parts

In vacuum forming and thermoforming, flame retardant grades is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry expla

0 Views PPOEM 17 Sep,2026

Choosing Between formed-in ribs and increased sheet thickness – High Volume Runs

formed-in ribs and increased sheet thickness are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished p

0 Views PPOEM 17 Sep,2026

Validate cycle time: A Practical Thermoforming Guide – 6 mm Sheet

This guide covers how to validate cycle time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

Specify draw ratio – Method and Checks – Food Contact Parts

This guide covers how to specify draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Pvc vs Abs: Cost, Quality and Lead Time – Painted Parts

PVC and ABS are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The comparison below is the

0 Views PPOEM 17 Sep,2026