Plan draw ratio: A Practical Thermoforming Guide

This guide covers how to plan draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cu

0 Views PPOEM 17 Sep,2026

Quote lead time – Method and Checks

This guide covers how to quote lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cu

0 Views PPOEM 17 Sep,2026

How to avoid scrap rate Before Tooling Starts – High Volume Runs

This guide covers how to avoid scrap rate on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is c

0 Views PPOEM 17 Sep,2026

How to plan fixture design on Thick Gauge Parts – Thick Gauge Work

This guide covers how to plan fixture design on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

Hot stamping Explained for Thick Gauge Buyers – Medical Housings

In vacuum forming and thermoforming, hot stamping is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry explains what i

0 Views PPOEM 17 Sep,2026

When local tooling Beats imported tooling, and When It Does Not – Painted Parts

local tooling and imported tooling are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The c

0 Views PPOEM 17 Sep,2026

How to Avoid corner strength in Vacuum Forming – Painted Parts

This guide covers how to avoid corner strength on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

How to reduce trim tolerance on Thick Gauge Parts – 6 mm Sheet

This guide covers how to reduce trim tolerance on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

Trim lead time – Method and Checks – High Volume Runs

This guide covers how to trim lead time on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cut

0 Views PPOEM 17 Sep,2026

Poor release from the mould: Causes and Fixes in Thermoforming – Painted Parts

poor release from the mould is one of the faults that shows up during sampling on any new thick gauge tool. It is visible on the part, but the cause is usually in the mould, the heating cycl

0 Views PPOEM 17 Sep,2026

Plan packing method – Method and Checks – Medical Housings

This guide covers how to plan packing method on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling i

0 Views PPOEM 17 Sep,2026

How to maintain surface finish Before Tooling Starts – Large Housings

This guide covers how to maintain surface finish on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooli

0 Views PPOEM 17 Sep,2026