How to troubleshoot sheet material Before Tooling Starts – Short Runs

This guide covers how to troubleshoot sheet material on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before t

0 Views PPOEM 17 Sep,2026

Trim batch repeatability – Method and Checks – 6 mm Sheet

This guide covers how to trim batch repeatability on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tool

0 Views PPOEM 17 Sep,2026

How to Improve draw ratio in Vacuum Forming – Medical Housings

This guide covers how to improve draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Painted finish or Textured sheet – A Comparison for Thermoforming – Large Housings

painted finish and textured sheet are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished part. The co

0 Views PPOEM 17 Sep,2026

What mould temperature control Means on a Formed Part – Large Housings

In vacuum forming and thermoforming, mould temperature control is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry ex

0 Views PPOEM 17 Sep,2026

Thick gauge forming vs Thin gauge forming: Cost, Quality and Lead Time – High Volume Runs

thick gauge forming and thin gauge forming are both used on the same kind of plastic parts, and the choice between them changes tooling cost, lead time and the properties of the finished par

0 Views PPOEM 17 Sep,2026

How to improve tooling cost on Thick Gauge Parts – Short Runs

This guide covers how to improve tooling cost on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026

How to plan draw ratio Before Tooling Starts – Medical Housings

This guide covers how to plan draw ratio on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is cu

0 Views PPOEM 17 Sep,2026

Choose draft angle: A Practical Thermoforming Guide – Thick Gauge Work

This guide covers how to choose draft angle on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

How to Plan texture depth in Vacuum Forming – High Volume Runs

This guide covers how to plan texture depth on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling is

0 Views PPOEM 17 Sep,2026

Post forming shrinkage – Why It Matters – Short Runs

In vacuum forming and thermoforming, post forming shrinkage is one of the variables that decides whether a part comes off the machine within tolerance or has to be reworked. This entry expla

0 Views PPOEM 17 Sep,2026

How to specify sheet heating on Thick Gauge Parts – Food Contact Parts

This guide covers how to specify sheet heating on a vacuum formed part: what the designer has to decide, what the mould maker needs to know, and the checks that catch problems before tooling

0 Views PPOEM 17 Sep,2026