Rail Transit Interiors Case: 12 mm TPO Equipment Covers from Drawing to Production

Vacuum forming case study: equipment covers for rail transit interiors produced in 12 mm TPO, 400 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Vending And Kiosk Builder Replaced an injection moulded part with Vacuum Formed Splash Guards in food grade polypropylene

Vacuum forming case study: splash guards for vending and kiosk produced in 8 mm food grade polypropylene, 3600 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

600 Machine Housings ESD safe ABS Thermoformed for Marine And Boat Building in 3 Weeks

Vacuum forming case study: machine housings for marine and boat building produced in 8 mm ESD safe ABS, 600 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: HDPE Dashboards for Dental Equipment – 5000 Parts at 12 mm

Vacuum forming case study: dashboards for dental equipment produced in 12 mm HDPE, 5000 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Pool And Spa Builder Replaced a fabricated PVC assembly with Vacuum Formed Machine Housings in UV stabilised HDPE

Vacuum forming case study: machine housings for pool and spa produced in 8 mm UV stabilised HDPE, 900 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Pool And Spa Case: 3 mm ESD safe ABS Cable Covers from Drawing to Production

Vacuum forming case study: cable covers for pool and spa produced in 3 mm ESD safe ABS, 900 pieces, tooling to first article in 8 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

900 Instrument Bezels PETG Thermoformed for Signage And Wayfinding in 4 Weeks

Vacuum forming case study: instrument bezels for signage and wayfinding produced in 3 mm PETG, 900 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Case Study: flame retardant ABS Light Housings for Semiconductor Equipment – 2400 Parts at 12 mm

Vacuum forming case study: light housings for semiconductor equipment produced in 12 mm flame retardant ABS, 2400 pieces, tooling to first article in 6 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Hvac Equipment Case: 5 mm flame retardant ABS Carry Cases from Drawing to Production

Vacuum forming case study: carry cases for HVAC equipment produced in 5 mm flame retardant ABS, 900 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

Retail Display Case: 3 mm food grade polypropylene Light Housings from Drawing to Production

Vacuum forming case study: light housings for retail display produced in 3 mm food grade polypropylene, 120 pieces, tooling to first article in 3 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

How a Beauty And Spa Equipment Builder Replaced a fibreglass lay-up with Vacuum Formed Ventilation Shrouds in PVC

Vacuum forming case study: ventilation shrouds for beauty and spa equipment produced in 4 mm PVC, 2400 pieces, tooling to first article in 4 weeks, full dimensional reporting.

0 Views PPOEM 17 Sep,2026

600 Door Panels HIPS Thermoformed for Signage And Wayfinding in 4 Weeks

Vacuum forming case study: door panels for signage and wayfinding produced in 8 mm HIPS, 600 pieces, tooling to first article in 4 weeks, full dimensional reporting.